Completed projects
Learn more about Capital Improvement projects in the 2017-2023 Capital Facilities Plan.
-
2018 ADA Curb Ramps
This project provided ADA-compliant upgrades and installations of curb ramps in various locations in the City.
-
2017 Overlay
The project involved grinding and overlaying portions of 1) 100th Ave NE/19th Ave SE, 2) 102nd Ave NE, and 3) Juanita-Woodinville Way.
-
2016 Overlay
This project provided an asphalt overlay and repairs to three sections of street: •120th Ave NE from NE 195th St to 132nd Ave NE •North Creek Parkway and North Creek Parkway N •Settlement area on 120th Ave NE / 39th Ave SE, just north of North Creek Parkway N
-
2015 Overlay
The project provided an asphalt pavement overlay of three streets: •4th Ave West between 228th St SW and 216th St S •9th Ave SE between 228th St SE and SR 524 •240th St SE at 34th Ave SE
-
Asphalt Patching
Where arterial asphalt is aging, patching can extend its lifespan. This involves grinding old pavement and paving.
-
Beardslee Boulevard Pavement Overlay
The Beardslee Blvd. Paving Overlay Project proposes to overlay Beardslee Blvd. between Sunrise Dr. and NE 185th Street, and partially reconstruct the pavement section from NE 185th St to 110th Ave NE with hot mix asphalt (HMA).
-
Crack Sealing
This project involves crack sealing approximately 39 lane miles of roadway throughout Bothell.
-
Slurry Seal
Beginning in 2018, the City will utilize a new method to make our residential roads last longer called a Slurry Seal. A Slurry Seal is a quarter-inch layer of fine gravel, asphalt, and oil that will protect the pavement from weather and refresh the surface. This method is most effective on roads that are starting to show their age, but have not fallen apart.