ADA Curb Ramps

As part of the City's Sidewalks Program and the annual Safe Streets and Sidewalks-funded Pavement Preservation Program, and in compliance with the Americans with Disabilities Act (ADA), the City will construct ADA-compliant curb ramps at several intersections along the corridors of:

  • 4th Ave. W
  • NE 192nd Pl.
  • 104th Ave. NE
  • Beardslee Blvd.
  • Brickyard Rd. NE
  • Juanita Woodinville Way NE
  • 119th Ave. NE
  • NE 160th St.

Construction will include the installation of Accessible Pedestrian Systems (APS), curbs and gutters, sidewalks, signing, and striping. 

Under the Pavement Preservation Program, the City used the Pavement Condition Index to identify street segments that could benefit from an asphalt overlay and repairs. The Washington State Department of Transportation (WSDOT) requires that the City meet the most current accessibility requirements along each street segment to be paved, so the existing pedestrian crossings along these streets must be upgraded. In addition to the curb ramps associated with the Pavement Preservation Program, other projects identified by the Sidewalk Program are included in this project. 

Schedule

On April 2, 2019, the City Council awarded the construction contract for this project to Kamins Construction Inc. The contractor is expected to begin construction in late April and plans to finish by late June or early July.

Map

2019 ADA Curb Ramps - Vicinity Map

Funding

The estimated cost of this project is $433,785.39. The project is funded by the Safe Streets and Sidewalks levy and the City's Sidewalk Program.