Description


This project replaced and improved various utilities at several downtown locations.

Water Main


  • Replaced the existing asbestos cement (AC) water main along NE 188th Street with 12-inch ductile iron water main between Horse Creek and Bothell Way NE.
  • Replaced the existing AC water main with 8-inch ductile iron water main from 98th Avenue NE to 96th Avenue.

Sewer Main


  • Replaced the existing concrete sanitary sewer main along NE 182nd Street from 98th Avenue NE to 96th Avenue.

Storm Drain


  • Installed a 24-inch storm drainage system along NE 182nd Street from 98th Avenue NE to 97th Avenue and along Ormbrek Street respectively.

Schedule


  • Bid Opening: November 16, 2015
  • Construction Phase: Late February to late May 2016