Completed Projects

What we've been up to


The City is teeming with construction activity these days.  Here are some of the recent Capital Improvement Projects we've completed.
  1. Bothell Corridor & Citywide Safety Projects

    These federally funded projects provided safety improvements at various locations throughout the City.

  2. Bothell-Everett Hwy & 228th St SE

    This project reconfigured the intersection at Bothell-Everett Highway and 228th St SE in Canyon Park, to enhance traffic safety and operations.

  3. Downtown Utility Projects

    This project replaced and improved various utilities at several downtown locations.

  4. Horse Creek Improvements

    The project replaced the existing Horse Creek pipe with a hybrid open-channel/culvert system along 98th Ave NE.

  5. Pavement Overlay 2015

    2015's overlay project included portions of 4th Ave W, 9th Ave SE, and Fitzgerald Rd/240th St SE.

  6. Pavement Overlay 2016

    This project rehabilitated roadways in the North Creek Parkway area and along 120th Avenue NE and NE 180th Street.

  7. Sammamish River Off-Channel Habitat Restoration

    This project reconnected and restored 1,100 feet of an old remnant channel and floodplain of the Sammamish River.

  8. SR 522 Stage 1

    This project was designed to relieve congestion on SR 522 at the 96th Ave NE intersection.

  9. SR 522 Stage 2

    This part of the project includes two sections of SR 522, which adjoin each end of the Stage 1 project. Stage 2A is finished, and Stage 2B is being designed.

See the City's current and upcoming projects.