| | Bothell Connector - 39th Ave SE Extension Project | | The project will construct a 3-lane arterial roadway from 240th Street SE to north of 228th Street SE where there is currently a gap in the existing north-south arterial. STATUS: 60% design complete. Project on hold until funding is identified. |
|
| | Bothell Crossroads SR 522 Realignment | | The Bothell Crossroads project realigns State Route 522 to the south between NE 180th Street and 102nd Avenue NE. STATUS: Phase III construction is currently underway; Phase I & II are constructed. |
|
| | Bothell-Everett Highway from 240th St SE to 228th St SE | | The Bothell-Everett Highway corridor is a major north-south route in Bothell that requires improvements to provide acceptable levels of service for motorists, cyclists, and pedestrians. STATUS: 70% design underway. Start of construction anticipated in early 2013. |
|
| | Downtown Contaminated Soil and Groundwater Clean Up | | The environmental cleanup of several contaminated sites must occur prior to their redevelopment for the Downtown Revitalization Plan. STATUS: Second phase of petroleum contamination at the Crossroads sites to occur concurrently with the Crossroads project. |
|
| | Downtown Revitalization Plan | | The plan will capitalize on the historic charm of the City's Main Street, bring new retail, offices and create five new residential neighborhoods in the downtown district. |
|
| | Main Street Enhancement | | The Main Street Enhancement project prepares existing Main Street businesses to more successfully compete as new commercial development occurs on revitalized lands. STATUS: 30% design complete. |
|
| | Main Street Extension | | Extending Main Street to the west will tie the historic portion of Main Street to the new development west of SR 527. STATUS: 30% design complete. |
|
| | Multiway Boulevard at Bothell Way NE | | The Multiway Boulevard at Bothell Way NE project balances the competing needs of roadway capacity, local access, street parking, urban density, and pedestrian comfort. STATUS: Phase 1 construction underway, spring through winter 2013. |
|
| |
| | NE 200th St Pedestrian/Sewer Project | | The project will provide a curb, gutter, and sidewalk along the north side of NE 200th St between 100th Ave NE and 104th Ave NE. STATUS: 60% design complete; construction scheduled to begin spring 2014. |
|
| | North Creek Trail | | The proposed trail connects to the Regional Sammamish River Trail / Burke –Gilman Trail in King County and with the Snohomish County Regional Interurban Trail at McCollum Park. STATUS: Section 3 design underway. |
|
| | Pavement Preservation and Management | | The City periodically conducts a field survey of pavement conditions to determine the roadway sections in the highest need of repair or replacement. STATUS: Planning phase. Construction scheduled to begin in summer 2013 and be completed in fall 2013. |
|
| | SR 522 Stage II | | Stage II includes improvements along SR 522 from the west City limits to Hall Road. STATUS: Currently under construction. |
|
| | SR 522 Wayne Curve | | The SR 522 Wayne Curve project improves capacity and enhances the west entrance to the City on SR 522 to SE 180th Street. STATUS: Construction complete. |
|